Welch Allyn LS200 Procedure Light - User Manual User Manual

Page 18

Advertising
background image

12

Chapter 2 Mounting and Operating Instructions

Welch Allyn LS200 Procedure Light

3. Using the template indicators on left side of this page (3 1/8"

[8cm] on center), mark the location for drill holes on the wall.
Make sure they are vertical.

For wooden walls:

No pilot hole is needed. Use 1.5" 3.8cm) wood screws
from transformer hardware kit.

For concrete walls:

Using a hammer drill and 3/16" (2.3mm) masonry drill bit,
drill holes for plastic anchors to a minimum of 1" (2.5cm)
deep. Tap in plastic anchors from transformer hardware kit
until flush.

3 - 1/8”
8cm

Advertising