INSTALLATION PROCEDURES

3-2

Even though a 12-inch clearance is acceptable, it is recommended that the rear of the dryer

be positioned approximately two (2) feet (24-inches) from nearest obstruction (i.e., wall) for ease of
installation, maintenance, and service. Bulkheads and partitions should be made from
noncombustible materials.

The clearance between the bulkhead header and the dryer must be a minimum of 4-inches

and must not extend more than 4-inches to the rear of the dryer front. The bulkhead facing must not
be closed in all the way to the top of the dryer. A 2-inch clearance is required.

NOTE: Bulkhead facing should not be installed until after dryer is in place. Ceiling area must be
located a minimum of 12-inches above the top of the dryer.
IMPORTANT: Even though a minimum of only 12-inches is required, 18-inches or more is
suggested, for steam dryers and especially in cases where sprinkler heads are over
the dryers.
NOTE: When fire sprinkler systems are located above the dryers, a minimum of 18-inches above
the dryer console (module) is suggested. Dryers may be positioned side wall to side wall
however, l or 2-inches is suggested between dryers or wall) for ease of installation and
maintenance. Allowances must be made for the opening and closing of the control and lint
doors.

Figure.3-1 Dryer Enclosure Requirements.

B. DRYER ENCLOSURE REQUIREMENTS

M ic r o Pr o c e s s or C o n tr o l

D O W N

jkl

m no

7

6

U P

9

w xyz

3

tu v

4

0

a bc

1

d ef

pq rs

8

5

2

c hi

S TO P

C Y C LE

E N TE R

S IN G LE

S TA R T

Advertising
This manual is related to the following products: