Peg survey 11 – Leica Geosystems TPS300 Basic Series User Manual
Page 11
TPS300 Mining Manual-1.0.0en
Peg Survey
11
Backsight Point
1/3
PtID :
150
Hz
:
98°12'45"
V
:
99°45'23"
hr
:
-1.263 m
HD
:
----.--- m
<EXIT> <SEARCH>
<MEAS>
Proceeding Peg Survey, continued
Measure Foresight Point
PtID:
-----
<OK>
> Step 7
Enter a desired
foresight point
number (PtID).
<OK>
Saves the foresight
point number and
proceed to the
measure dialog.
Sample dialog:
> Step 5
Enter the reflector
height (hr) for the
backsight point, if
required.
The sign for the
reflector height (hr)
is normally negative.
> Step 6
Aim at backsight
point and measure.
<MEAS>, ALL or DIST/REC
Angle and distance
measurements are
triggered and stored
in the internal
memory.
<SEARCH>Allows users to
search and choose a
different backsight
point.
<EXIT>
Terminates the
program and returns
to the start-up menu.
Sample dialog: