Before starting peg survey – Leica Geosystems TPS300 Basic Series User Manual

Page 7

Advertising
background image

TPS300 Mining Manual-1.0.0en

Peg Survey

7

Before starting Peg Survey

Data uploading using "Mining
Editor"

• Station coordinates

(East, North, Height,
Grade elevation)

• Backsight point coordinates

(East, North, Height,
Grade elevation)

• Tolerances, sequence,

number of sets

• Job definition

Uploading of fixpoint
coordinates, tolerances,
sequence and number
of sets is mandatory to
enable the operation of
"Peg Survey".

To create new jobs on
board the instrument, a
set of tolerance must be
available.

Advertising