Start and execution peg survey, Peg survey 8 – Leica Geosystems TPS300 Basic Series User Manual

Page 8

Advertising
background image

TPS300 Mining Manual-1.0.0en

Peg Survey

8

Start and execution Peg Survey

Input Station

PtID :

100

hi

:

-1.265 m

<EXIT>

<SET>

Start "Peg Survey" from
the program menu.

Start-up menu:

> Step 3

Choose "Start" and

press

, then

enter point number
(PtID) and
instrument height
(hi) for the station.

The sign for the
instrument height
(hi) is normally
negative.

PROGRAMS

PEG SURVEY

FLP

SETTING OUT

<EXIT>

Choose "Peg Survey" and press

.

> Step 1

Select a job.

> Step 2

Confirm the set of
tolerances.

Sample dialog:

> Step 4

<SET>
Set Point number
(PtID) and
instrument height
(hi).

<EXIT>

Leaves "Input
Station" and returns
to the start-up menu.

Advertising