Start and execution peg survey, continued, Grades 19 – Leica Geosystems TPS300 Basic Series User Manual
Page 19
Advertising
![background image](/manuals/652010/19/background.png)
TPS300 Mining Manual-1.0.0en
Grades
19
Mining_z06
Start and execution Peg Survey, continued
Mining_z05
150
1
H
New Gradeline
> Step 1
Enter the slope
gradient
(proportion e.g.
1:150).
Slope gradient explained:
Gradeline
> Step 2
Enter the height
difference.
Height difference explained:
H:
Current height of
gradeline above
mine floor
dH:
Height difference
dH
> Step 3
<SET> Set the
entered values and
proceeds to the
gradeline marking
dialog.
<EXIT>
Leaves the
application "Grades"
and return to the
menu dialog of
"FLP".
Station
Foresight Point