Peg survey 12 – Leica Geosystems TPS300 Basic Series User Manual
Page 12

TPS300 Mining Manual-1.0.0en
Peg Survey
12
Foresight Point
1/3
PtID :
151
Hz
:
198°12'45"
V
:
94°45'23"
hr
:
-1.632 m
HD
:
----.--- m
<EXIT>
<MEAS>
Proceeding Peg Survey, continued
<REJECT> Reject the
measurement and
measure the set
again.
<ACCEPT> Accept the result
and continue with
the next set.
Sample dialog:
> Step 8
Enter the reflector
height (hr) for the
foresight point, if
required.
The sign for the
reflector height (hr)
is normally negative.
> Step 9
Aim at foresight
point and measure.
<MEAS>, ALL, or DIST/REC
Angle and distance
measurements are
triggered and stored
in the internal
memory.
<EXIT>
Terminates the
program and returns
to the start-up menu.
Repeat
> Step 6
and
> Step 9
until
all sets are
measured.
If the tolerances
after a set are not
met, the user has
the option to
continue with the
measuring or
rejecting the data.