5 initial start-up, 1 switching on, 2 function check – FRITSCH PULVERISETTE 2 User Manual

Page 19: 3 switching off, 5initial start-up

Advertising
background image

5

Initial start-up

Perform initial start-up only after all work as described in Ä Chapter 4

‘Installation’ on page 17 has been carried out.

5.1 Switching on

1.

Connect the device to the mains.

2.

Switch on the device using the mains switch (on the back of the

device).

3.

The display of the digital timer lights up red.

5.2 Function check

1.

Close the hood.

2.

The laboratory mortar mill starts to work as soon as the START

button is pressed.

5.3 Switching off

1.

Press the STOP button.

2.

Disconnect the device from the mains at the mains switch (on the

back of the device).

Initial start-up

- 19 -

Advertising