3.0 Installation Instructions

Consult the product drawing that was submitted for this order

before proceeding.
3.1 Space Requirements

A minimum of 24" clear space must be allowed on all sides of the

collector that do not include the access ladder or ductwork. The side

where the access ladder is located requires a minimum clear space of

46". For Walk-in Plenum units a minimum of 48” must be allowed on

the manifold side. More space may be required where inlet or outlet

ductwork and the explosion vent is located. For standard plenum top

access units, be sure to allow adequate height for removal of bags

and cages.
3.2 Foundations and Anchoring

The foundation must be designed to be adequate to support the

collector’s operating weight (see Section 9), seismic, wind and snow

loads (if any), collected dust, and any optional equipment, in

accordance with appropriate codes. Secure all anchor bolts to ensure

that the collector is firmly attached to the foundation. Base plates on

columns may require grouting after leveling. Multiple module units,

operating at elevated temperatures, may require expansion provisions

in the structural supports (see erection drawings for details).

4

tank/pulse pipe assembly. Each pulse valve serves twelve bags.

Pulse pipes are 1

1 2

", schedule 40 pipe and have a quick

disconnect coupling and a pinned end.
Standard collectors are primed and finish painted on the exterior with

high solids alkyd enamel. Interior surfaces have a prime coat. High

temperature collectors have one coat of zinc rich primer. Special paint

coatings are available as an option.
Some of the more common optional features available with the

Millennium include pressure demand cleaning, explosion vents, inlet

adapter plates, an arrangement to permit installation of up to 4"

thickness insulation at the destination job site, walk-in plenum, trough

hopper, high temperature features, and various ancillary components.

Consult the P.O. and submittal documents for what is included with

the specific order.

3.3 General Erection Procedure
1. Spreader bars must be used at all times when handling the

Millennium to prevent any possibility of damage. These shall be

connected to the lifting lugs provided on the Millennium for this

purpose. Only personnel experienced in rigging and handling

heavy equipment shall be employed to erect the Millennium.

Refer to proper drawings for specific lifting instructions for

module configuration.

2. All modules shall be separately positioned on the structure and

adjacent to one another in the order in which they will be joined

together. (See Section 1.4)

3. All joints between one of the end modules and adjacent modules

shall be prepared for connection to one another. This applies to all

perimeter and internal connecting flanges. Ensure the following:

• All flanges are flat and planar. Correct any bending, warping, or

denting that may have occurred when the modules were being

transported or handled.

• All flanges are clean and free from debris, contamination and

discontinuities of any kind, such as weld or paint splatter, mud,

rust, oil, or grease.

• All bolt holes are correctly aligned.

4. Caulk all connecting surfaces using the caulking compound

supplied. On standard units, this is a butyl caulk. Silicone caulk is

supplied on units rated to 400°F. See Figure 4 for the method of

applying caulk to a housing flange.

CAUTION: Particular caution must be exercised when sealing the

internal connection between the tube sheets in adjacent modules.

The tube sheet is the horizontal plate through which the filters are

inserted and which forms the barrier between the clean and dirty air

sides of the collector. The flange of the tube sheet between modules

is provided with a double row of bolt holes. Each row of holes shall

be caulked as shown in Figure 4. It is only necessary to apply caulk

to one face of each joint. Apply the caulk liberally to ensure an

effective seal.

Figure 3

Pulse Pipe

Clean Air

Plenum

Solenoid

Valve

Air Hose

Compressed Air Surge Tank