Installation, Chapter 2 installation – AERCO BMK 3.0 LN Natural Gas July 2011 User Manual

Page 13

Advertising
background image

INSTALLATION

2-1

CHAPTER 2 INSTALLATION

2.1 INTRODUCTION

This Chapter provides the descriptions and

procedures necessary to unpack, inspect and

install the AERCO Benchmark 3.0 Boiler. Brief

descriptions are also provided for each available

mode of operation. Detailed procedures for

implementing these modes are provided in

Chapter 5.

2.2 RECEIVING THE UNIT

Each Benchmark 3.0 System is shipped as a

single crated unit. The shipping weight is

approximately 2,170 pounds. The unit must be

moved with the proper rigging equipment for

safety and to avoid equipment damage. The unit

should be completely inspected for evidence of

shipping damage and shipment completeness at

the time of receipt from the carrier and before

the bill of lading is signed.

NOTE

AERCO is not responsible for lost or

damaged freight.

Each unit has a Tip-N-Tell indicator on the

outside of the crate. This indicates if the unit has

been turned on its side during shipment. If the

Tip-N-Tell indicator is tripped, do not sign for the

shipment. Note the information on the carrier’s

paperwork and request a freight claim and

inspection by a claims adjuster before

proceeding. Any other visual damage to the

packaging materials should also be made clear

to the delivering carrier.

2.3 UNPACKING

Carefully unpack the unit taking care not to

damage the unit enclosure when cutting away

packaging materials
A close inspection of the unit should be made to

ensure that there is no evidence of damage not

indicated by the Tip-N-Tell indicator. The freight

carrier should be notified immediately if any

damage is detected.
The following accessories come standard with

each unit and are either packed separately

within the unit’s packing container or are factory

installed on the boiler:



Pressure/Temperature Gauge

Spare Ignitor-Injector

Spare Flame Detector

ASME Pressure Relief Valve

Condensate Drain Trap & Adapter `

2” Gas Supply Shutoff Valve

When ordered, optional accessories may be

packed separately, packed within the boiler

shipping container, or may be installed on the

boiler. Any standard or optional accessories

shipped loose should be identified and stored in

a safe place until ready for installation or use.

2.4 SITE PREPARATION.

Ensure that the site selected for installation of

the Benchmark 3.0 Boiler includes:

Access to AC Input Power corresponding to

the ordered power configuration. The

available power configurations are:

208 VAC, 3-Phase, 60 Hz @ 20 A

460 VAC, 3-Phase, 60 Hz @ 15 A

Access to Natural Gas line at a minimum

static pressure of 3.5” W.C.(FM) or 4.0” W.C.

(IRI). Maximum static pressure must not

exceed 2 psi.

2.4.1 Installation Clearances

The unit must be installed with the prescribed

clearances for service as shown in Figure 2-1.

The minimum clearance dimensions, required by

AERCO, are listed below. However, if Local

Building Codes require additional clearances,

these codes shall supersede AERCO’s

requirements. Minimum acceptable clearances

required are:

Sides: 24 inches

Front : 24 inches

Rear: 43 inches

Top: 18 inches

All gas piping, water piping and electrical conduit

or cable must be arranged so that they do not

interfere with the removal of any panels, or

inhibit service or maintenance of the unit.