MAINTENANCE

7-6

7.8 SHUTTING THE BOILER DOWN FOR

AN EXTENDED PERIOD OF TIME

If the boiler is to be taken out of service for an

extended period of time (one year or more), the

following instructions must be followed.
1. Set

ON/OFF switch on the front panel to the

OFF position to shut down the boiler’s

operating controls.

2. Disconnect AC power from the unit.
3. Close the water supply and return valves to

isolate boiler.

4. Close external gas supply valve.
5. Open relief valve to vent water pressure.

7.9 PLACING THE BOILER BACK IN

SERVICE AFTER A PROLONGED

SHUTDOWN

After a prolonged shutdown (one year or more),

the following procedures must be followed:

Review installation requirements included in

Chapter 2.

Inspect all piping and connections to the unit.

Inspect exhaust vent, air duct (if applicable).

Perform initial startup per Chapter 4.

Perform safety device testing and the scheduled

maintenance procedures per Chapters 6 and 7

of this manual.