5 visual inspection of the flame – AERCO Modulex EXT 321 - 1123 User Manual

Page 124

Advertising
background image

MODULEX EXT 321, 481, 641, 802, 962, 1123 BOILERS

Installation, Operation & Maintenance Manual

7.5 Visual Inspection Of The Flame

The burner must flame evenly over the entire surface when operating correctly. The flame must
burn with a clear, ORANGE, stable flame. Check the flame through the flame observation port
(Figure 7-2). The flame pattern should resemble the flame in the illustration below.

FLAME COLOR:

YELLOW

= CO2 HIGH NOT SATISFACTORY

BLUE

= CO2 LOW NOT SATISFACTORY

ORANGE

= OK

SATISFACTORY


Figure 7-2: Boiler Flame Observation Port Location

7.6 Proper Reassembly and Resealing of the Vent-Air Intake System

After removing, inspecting, and possibly cleaning the flue pipes and air intake, replace the
piping correctly. Refer to AERCO Venting Application Guide (GF-136-V) for information
concerning Modulex venting requirements.

Flame Observation Port

Igniter Cable

Flame Detector

Page 124 of 148

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0087_0E

12/01/14

Phone: 800-526-0288

GF-143

Advertising