2 connecting ac power to the control box, 3 wiring the cxt-e actuator, He- 111 − installation – AERCO SWDW68 U-Tube Double-Wall Heaters w/ECS User Manual

Page 18: Tm pt.no, Pt.no

Advertising
background image

HE-

111 − INSTALLATION

Rev B Mar 2013

2-8

TM

PT.NO.

SET

F

AUTO

RUN

MAN

HOLD

OP 1

OP 2

SP2

REM

2408

OVER TEMP SWITCH

TEMP CONTROLLER

PT.NO.

PANEL CAPTIVE

SCREW

Figure 2-6. Recessed Panel Behind Control Box Door

2.4.2 Connecting AC Power to the Control Box

3. Feed the external 120 VAC power leads through the cutout labeled “POWER IN” on the right side of

the Control Box.

4. Connect the LINE, NEUTRAL and GROUND leads to the TB-2 terminals shown in Figure 2-7.

CONTROL BOX - INTERIOR BOTTOM VIEW

REAR

TB-2

L

IN

E

N

E

U

T

R

A

L

G

R

O

U

N

D

1

0

0

1

0

1

1

0

2

G

N

D

FRONT

VOLTAGE

REGULATOR

TERMINAL

BLOCK TB-2

EXTERNAL POWER WIRING

(120 VAC)

Figure 2-7. ECS Control Box AC Power Connections

2.4.3 Wiring the CXT-E Actuator

5. Connect the Control Box cable labeled ACTUATOR to the 3-pin connector plug on the CXT-E

Actuator.