CAMCORP CAM-AIRO Vertical Cartridge User Manual

Page 12

Advertising
background image

CAMCORP, INC.

Phone: 913-831-0740 Fax: 913-831-9271

www.camcorpinc.com

( !,

+0!

3

+ 24

The firing sequence of the diaphragm valves on the dust collector should

be set so that no two adjacent rows of cartridges fire in succession (if

possible) to insure maximum cleaning and life of the filter media. This can

only be achieved when wiring the pulse timer board to the solenoid

valves.

Apply electrical power to the smart timer and make sure that it is cycling

completely through all rows of the unit. This will only happen when the

smart timer is put into manual mode. Refer to the Dwyer IOM manual

included in this manual for further start-up instructions.

If your dust collector was shipped via common carrier rather than a

contract hauler there is a possibility that the solenoid enclosure was not

shipped installed on the unit. If this is the case, there is a mounting plate

welded on the housing or the air header with the bolt pattern of the

enclosure already drilled. Bolt the enclosure and install the nylon (or

copper) tubing with the fittings provided making sure that the solenoids

are connected to their corresponding diaphragm valve.Di

Valves and Piping:

After the unit has been installed the diaphragm

valves should be checked to make sure that the port marked “IN” is

assembled to the compressed air manifold. The “IN” connection of the

solenoid valve is connected to the diaphragm valve by means of ¼” nylon

or ¼” copper refrigeration tubing. Each nut on the compression fittings

should be checked for tightness before the compressed air manifold is

pressurized. In most cases a slip fit fitting has been used. The integrity of

the nylon tubing inside each fitting should be checked by pulling gently on

each tube. If the tube pulls out, simply push it back into the fitting until it

will not go any further. The solenoids are shipped with a plastic plug in

the discharge side of the valve. These plugs must be removed for proper

operation.

Differential Pressure Ports

:

The differential pressure ports are located

together in the side wall of the dust collector. One above the tubesheet

and one below. Nylon or metal tubing must be connected to each port

and run to the smart timer enclosure. Tube fittings are included with the

shipment and should be located in the miscellaneous parts box.. When

installing the tubing, make sure that the high-pressure port on the timer

enclosure is connected below the tube sheet and the low-pressure port is

connected above the tube sheet on the dust collector.

3-4

Advertising