Temperature and humidity guidelines, Power connection guidelines – Cisco XR 12416 User Manual

Page 16

Advertising
background image

Chapter 2 Preparing for Installation

Site Requirement Guidelines

2-16

Cisco XR 12416 and Cisco XR 12816 Router Chassis Installation Guide

OL-17440-01

Temperature and Humidity Guidelines

The operating and nonoperating environmental site requirements are listed in

Table A-4 on page A-4

. The router normally operates within the ranges listed in

the table, however, if a temperature measurement is approaching a minimum or
maximum parameter it indicates a potential problem. Maintain normal operation
by anticipating and correcting environmental anomalies before they approach
critical values by properly planning and preparing your site before you install the
router.

Power Connection Guidelines

You can configure the router with either an AC-input or DC-input power
subsystem, so the site power source requirements differ depending on the power
subsystem in your router. Ensure all power connection wiring conforms to the
rules and regulations in the National Electrical Code (NEC), as well as local
codes.

Caution

Proper grounding is necessary to avoid damage from lightning and power surges.
See the

“Router Bonding and Grounding Receptacles—Top Rear” section on

page 2-22

for grounding requirements.

Advertising