Fleet Engineers INS-97005 User Manual

Roll-up door installation instructions

Advertising
background image

STEP 2:

Headroom

Clearance -

Measure headroom

to be sure there is

sufficient clearance to

accept the counterbal-

ance and to allow the

door to clear under the

roof bows

(Figure 2A).

Use the chart in

Figure

2B to determine the

required headroom for

your particular installa-

tion. Keep in mind that

whatever you add must

be flush with the inside

of the side post.
Note:

Figure 2A shows

the counter-balance

against roof skin.

Roll-Up Door

Installation Instructions

Installation Sheet #INS-97005

Installation Sheet # INS-97005 • Rev A 2/98 • Rev B 6/08

STEP 1

Check the door parts to make sure you have received all needed

items. Note any shortages or damages on delivery receipt as Fleet

Engineers cannot be responsible for parts lost or damaged in

shipment.
Figure 1

1. Hardware box - fasteners, rollers, cables, hinges, top fixtures.

2. Counterbalance spring assembly with drums, shaft & bracket(s).

3. Pair of horizontal tracks.

4. Pair of vertical track assemblies.

5. Header seal and retainer or head seal on top panel.

6. Two door halves.

7. Side seals - optional on 3/4 door.

BEFORE PROCEEDING WITH THE INSTALLATION READ

EACH STEP AND SEE SAFETY NOTICE INSTRUCTIONS.

IMPORTANT!

Figure 2A

Figure 1

STEP 3: Sideroom Clearance

The minimum sideroom clearance is 2-1/2” on each side from the

post (opening) to the wall.

Figure 3.

In the event it is necessary to add on the corner post, keep the

added piece flush with the inside of the header.

Figure 3

Figure 2B

A

B

C

D

E

3/4” Doors

7” 5” 18” 2-1/2” 1-1/2”

STEP 4: Measuring Door Opening

Because each Fleet Engineers door is custom made, it is neces-

sary to check the opening measurement. These measurements

must be finished opening width and height. “Finished” means

there must be the header and side room clearance mentioned in

previous steps to insure proper installation.
Opening height is from the header to the sill,

Figure 2A. Opening

width is from post to post,

Figure 3. On older units, measure-

ments should be taken in at least three different places for open-

ing width and height. Cutting back of the floor on older units may

be necessary to permit the door to sit on the sill, below the floor.

See “D” dimension and chart in

Figure 2B.

STEP 5: Vertical Track Installation

Position vertical tracks on corner posts as shown in

Figure 3 and

clamp in place. Notch in mounting angle should line up with the

bottom of header

(Figure 2A). If necessary, the bottom of the

vertical track assemblies may be cut off to permit the notch to line

up with the underside of the header. Keep both tracks the same

length.

Advertising