FloAire Canopy Hood User Manual

Page 20

Advertising
background image

20

Attachment of Side PSP

Figure 11

PSP with a FBSS Configuration

Figure 12

AC-PSP Installation

1. Locate the assembly and unpack it from the crate, being very careful not to dent or scratch the

outer surface. NOTE: Report any damage to the delivering freight carrier and file a claim if
appropriate.

2. If the supply risers are to be field cut, cut the risers in as desired.
3. Locate the ceiling joists which will support the assembly. If using Unistrut®, then securely attach

to the ceiling joist.

Advertising
This manual is related to the following products: