Installation, Mechanical, Site preparation – FloAire Demand Control Ventilation System User Manual

Page 6: Assembly, Room sensor installation, Utility cabinet installation (typical)

Advertising
background image

A0023662

May 2014 Rev.5

6

Liquid
Tight
Conduit

INSTALLATION

It is imperative that this unit is installed and operated with the designed airflow and electrical supply in
accordance with these manual and applicable codes. If there are any questions about any items, please
call the service department at 1-866-784-6900 for warranty and technical support issues.

Mechanical

WARNING: DO NOT LIFT CONTROL BY WIRING COMPONENTS

Site Preparation

1. Provide clearance around installation site to safely install equipment into its final position.

Supports must adequately support equipment. Refer to manufacturer’s estimated weights.

2. Consider general service and installation space when locating unit.

Assembly

When the control panel is ordered in a utility cabinet installed on the hood, there is no mechanical
assembly required by the installer. If the control panel is ordered as a wall mounted panel, the enclosure
must be secured to a fixed wall near the exhaust hoods. Be certain to maintain adequate clearance
from excessive heat sources such as appliances to prevent damage of the components
.

Room Sensor Installation

A room temperature sensor is provided with the panel. It should be installed in a safe location, free of
influence from external heat sources. It should be indicative of the average kitchen temperature away
from the appliances. The room sensor will always be landed at terminals T1A, T1B on the J10 connector
of the ECPM03.

Utility Cabinet Installation (Typical)