New England Arbors VA80140 User Manual

Scps.pvoujoh4ztufn, Fofsbm*ogpsnbujpo, 5ppmt3frvjsfe

Advertising
background image

Materials Include:

*OTUBMMBUJPO.PVOUJOH*OTUSVDUJPOT

"SCPS.PVOUJOH4ZTUFN

1. Read instructions carefully before assembling.
2. Identify each component from material list.
3. In the event of missing or defective parts,
Please call our customer service department
At 1-800-282-9346 (ex.#20).

(FOFSBM*OGPSNBUJPO

1. Cordless Drill
2. Spirit Level
3. Tape Measure

5PPMT3FRVJSFE

4 Galvanized Steel Surface Mounts
4 Plastic Mounting Sleeves
4 Locking Plugs /or/ Bolt & Wing Nut
4 White Stainless Screws
16 Tapcon Screws with Drill Bit

3

1

2

(SPVOE.PVOU

4VSGBDF.PVOU

Materials Include:

4 Galvanized Steel Ground Augers
4 Plastic Mounting Sleeves
4 Locking Plugs /or/ Bolt & Wing Nut
4 White Stainless Screws
1 Steel Turning Rod

Refer to your arbor instructions

for exact dimensions between

posts. Measure out and mark on

the ground each post location.

Double check your spacing

before continuing.

Turn the auger using the turning

rod and apply even downward

pressure. For dry or hard ground,

use water to soften the ground

first.

As you turn the auger into the

ground, check with your level

to ensure it is straight. Do this

at least twice before you have

completely installed the mount.

"SCPS.PVOUJOH4ZTUFN

"SCPS.PVOUJOH4ZTUFN

Advertising