2vftujpot, Eejujpobm*ogpsnbujpo – New England Arbors VA80140 User Manual

Page 2

Advertising
background image

6

4

5

Once the ground stop (see sketch

3 below) is at ground level, the

mount is completely installed.

Slide the plastic sleeve over the

steel mount until the bottom rests

on the ground stop.

Line up the holes in the plastic

sleeve and steel mount. Take a

locking plug, or alternative bolt

and wing nut (included) and

insert it into the hole until it is

firmly in place. Repeat steps 2

to 5 for the remaining mounts.

Once you have installed and

verified the orientation of each

mount, set your arbor posts onto

the mounts and push down to

ground level. Using one of the

screws provided, secure the

bottom of each post to the

mounts as shown.

If you have questions concerning the installation of this product and require assistance, please call our
Customer service department at 1-800-282-9346 (ext.#20)

, weekdays from 8:00 am. to 4:00 pm. EST.

If you have comments or suggestions about this product, let us know! Call: 1-800-282-9346 (ext.#24).
Thank you for purchasing the “Arbor Mounting System”.

2VFTUJPOT 

1. For installation of the surface mounts on concrete, use the bit provided to drill your pilot holes.
Fasten each mount in place using the tapcon screws provided.
2. For installation of the surface mounts on wood or a similar surface, use wood screws (not included).
3. Basic identification sketch of each part:

"EEJUJPOBM*OGPSNBUJPO

Plastic Sleeve

(3 1/2” , 4” or 5”)

Steel Surface

Mount

Steel Ground

Auger

Locking

Plug

Steel Turning Rod

Ground Stop

1

2

3

4

6

5

Bolt &

Wing Nut

Advertising