Step one, Assemble the pergola top, Step t wo – New England Arbors VA84242 User Manual

Page 2: Assemble the side panels

Advertising
background image

STEP ONE

2

Lay out the two carrying beams as illustrated with pre-
drilled holes facing up.

Position the three middle rafters over the respective pre-
drilled holes on the carrying beams as illustrated.

Using the 3” screws fasten the three middle rafters to the
carrying beams.

The Fairfield Deluxe Arbor

Assemble the Pergola Top

1

2

3

www.newenglandarbors.com

STEP T WO

Insert the short horizontal spindles into the middle vertical
spindle (holes on both sides).

Slide the two outside vertical spindles into position as illustrated
(holes on one side).

Layout the bottom rail and insert the vertical spindles as
illustrated.

Slide horizontal mid-rail over the vertical spindles as illustrated.

Slide the horizontal curved rail down over the vertical
spindles as illustrated to complete one side panel.

Repeat for other side panel.

Assemble the Side Panels

1

2

3

4

5

6

1

2

3

1

3

4

5

2

Note: Middle Spindle is slightly shorter than Side Vertical Spindles.

Advertising