Assemble the arbor beams – New England Arbors VA84231 User Manual

Page 2

Advertising
background image

S T E P O N E

2

Insert one steel stiffener (with steel block facing up) into
the lower pocket of the beam past the joiner. Push until
steel block hits the internal ribbing.

Slide the beam coupler over the beam. Install the coupler
so that the four holes are facing up. Push firmly until the
coupler bottoms out on the beam.

Slide a second beam coupler over the steel insert and into
the coupler.

Screw the coupler to the vinyl beams and steel using 3”
screws. The bottom and top holes will need to be pre-
drilled using the bit provided.

Repeat for second beam.

The Fair field Grande Arbor

Assemble the Arbor Beams

1

2

3

www.newenglandarbors.com

4

3

4

Pre-drill holes on bottom and top to

accomodate for internal steel stiffener.

5

2

Four holes facing up

1

Predrilled holes facing up

Beam rib

is removed to

accomodate steel

stiffener

Steel block should be facing up

5

Predrilled holes facing up

Advertising