Step five, Connect the arch system to the side panels, Step six – New England Arbors VA84240 User Manual
Page 5: Fill excavated holes
STEP FIVE
Temporarily position post caps on bottoms of arches.
With a helper, insert the bottom of the arches into the
posts until the arch rest on the stopper bolts.
Slide post caps down into position.
Install long screws into the two pre-drilled holes per posts.
Connect the Arch System
to the Side Panels
1
2
www.newenglandarbors.com
STEP SIX
Ensure that posts and side panels are level.
Fill around the posts with wet cement within 3 in. (7.6 cm.)
of your natural elevation.
Complete a final level check both horizontally and vertically.
and backfill the remaining space between concrete and
natural elevation with topsoil.
Fill Excavated Holes
1
2
3
5
1915 Dove St., Port Huron MI USA 48060
Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286
www.newenglandarbors.com
1
Level
1
4
2
3 in.
7.6 cm.
3
Level
Stopper Bolt
3
4
2
3