Connect the shelf boards to the back wall – New England Arbors VA68211 User Manual

Page 2

Advertising
background image

Align and insert the front wall to the assembly, ensuring all the

shelf boards snap into place and side walls are inserted.

Using the provided 5/8” screws, fasten the side wall to the
front and back wall from the inside of the posts as shown.

Each post will use two screws.

The Cambridge Raised Planter Box

4

5

www.edenarbors.com

Insert the shelf boards into the routed holes on the bottom rail.

Push until the locking tabs snap into place.

Insert the two side walls into the back wall panel as shown.

Note the tabbed rail will go on the bottom.

3

2

2

S T E P O N E

Lay out back wall panel on the work surface.

Connect the Shelf Boards

to the Back Wall

1

2

3

4

5

The Cambridge Raised Planter Box

Note Tab

Advertising