Install post caps – New England Arbors VA68212 User Manual

Page 2

Advertising
background image

S T E P T W O

Install the four Post Caps and Base Trims. Push post caps until the

locking tabs snaps into place.

The Cardiff Planter Box

Install Post Caps

5

3

1915 Dove St., Port Huron MI USA 48060

Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286

www.edenarbors.com

Insert the three floor boards into the pre-routed hole.

Align and insert the pre-assembled back panel to the side wall

panels. Ensure the bottom slats are also inserted into the pre-

routed hole. Push until the locking tabs snap into place.

3

4

2

4

5

S T E P O N E

Lay out front wall panel on the work surface.

Insert the side walls into the routed holes on the front wall
panel posts until rails bottom out. Push until the locking tabs

snap into place.

Connect the Front & Back Wall

to the Side Wall Panels

1

2

1

2

Advertising