Hanover trellis pg2 – New England Arbors VA54230 User Manual

Page 2

Advertising
background image

2

Take the arches and snap them onto either side of the

keystone.

Using four screws, fasten the arches to the keystone on both

sides as illustrated.

Note: All screws are self-tapping and require no pre-drilling.

Set aside the assembled arch.

1

2

S T E P O N E

Assemble the Top Arch

H a n o v e r Tr e l l i s I n s t r u c t i o n s

Lay out the bottom rail. Insert the vertical spindles into the

precut holes until they “bottom out”.

Slide the three middle rails onto the vertical spindles.

Space the rails approximately 9” apart.

Finish the “ladder” by placing the top rail onto the vertical

spindles.

The top rail has holes on both sides, but the spindles will

not go through it.

1

S T E P T W O

Assemble the Trellis

Bottom Rail

(Holes only on top of rail)

1

1

2

3

Middle Rails

(Identical holes on top and bottom of rails)

2

3

2

Advertising