6installation – SeaLand DTM01C Tank Monitor User Manual

Page 4

Advertising
background image

4

6

Installation

1 . Select panel location away from direct contact with water

and oil .

2 . Confirm clearance for wire connections behind wall, hull

liner or bulkhead .

3 . Using indicator panel template (fig . , page 5), cut out

panel access hole and drill fastener holes .

4 . With electrical power off, route 18-gauge stranded copper

wire from power source, through 0 .5 amp fuse (not provided),
to panel location . Route 18-gauge stranded copper wire from
holding tank probe cap to panel location . Make sure wires
extend out through access hole (fig . 2, page 2) .

5 . Install mounting frame (fig . 1, page 2) with four fasteners .

6 . Make proper 12 or 24 V DC wiring connections to indicator

panel . Refer to wiring diagram (fig . , below) .

7 . Push indicator panel onto mounting frame until it locks

into place .

6.1

Indicator Panel

(fig . , page 2)

Indicator Panel Template
Dimensions

(fig . , page 5)

3

5

Dometic Tank Monitor

Installation

5.4

Dimensions

Caution!
Do not install indicator panel in an atmosphere with potentially flammable or
explosive vapors.

Ref.

Dimension

A

83 mm (3 .25 in .)

B

51 mm (2 in .)

C

67 mm (2 .63 in,)

D

35 mm (1 .38 in .)

E

25 mm (1 in .) dia .

F

2 mm (0 .10 in .) dia .

G

51 mm (2 in .)
clearance behind wall

5

6

6

3

3

51 mm

(2 in .)

83 mm

(3 .25 in .)

10 mm

(0 .38 in .)

51 mm (2 in .) minimum

clearance behind wall

111 mm (4 .38 in .) dia

136 mm (5 .3 in .)

Advertising