6installation – SeaLand DTM01C Tank Monitor User Manual
Page 4
4
6
Installation
1 . Select panel location away from direct contact with water
and oil .
2 . Confirm clearance for wire connections behind wall, hull
liner or bulkhead .
3 . Using indicator panel template (fig . , page 5), cut out
panel access hole and drill fastener holes .
4 . With electrical power off, route 18-gauge stranded copper
wire from power source, through 0 .5 amp fuse (not provided),
to panel location . Route 18-gauge stranded copper wire from
holding tank probe cap to panel location . Make sure wires
extend out through access hole (fig . 2, page 2) .
5 . Install mounting frame (fig . 1, page 2) with four fasteners .
6 . Make proper 12 or 24 V DC wiring connections to indicator
panel . Refer to wiring diagram (fig . , below) .
7 . Push indicator panel onto mounting frame until it locks
into place .
6.1
Indicator Panel
(fig . , page 2)
Indicator Panel Template
Dimensions
(fig . , page 5)
3
5
Dometic Tank Monitor
Installation
5.4
Dimensions
Caution!
Do not install indicator panel in an atmosphere with potentially flammable or
explosive vapors.
Ref.
Dimension
A
83 mm (3 .25 in .)
B
51 mm (2 in .)
C
67 mm (2 .63 in,)
D
35 mm (1 .38 in .)
E
25 mm (1 in .) dia .
F
2 mm (0 .10 in .) dia .
G
51 mm (2 in .)
clearance behind wall
5
6
6
3
3
51 mm
(2 in .)
83 mm
(3 .25 in .)
10 mm
(0 .38 in .)
51 mm (2 in .) minimum
clearance behind wall
111 mm (4 .38 in .) dia
136 mm (5 .3 in .)