Flush switch panel – SeaLand DFP flush switches User Manual

Page 3

Advertising
background image

3

NEW INSTALLATION
1. Plan flush switch location so cable can reach toilet

base circuit board. Be sure cable cannot get wet.

2. Using correct Dometic, Vimar or Gewiss panel

template (see Section 5), mark center access and
fastener holes. Cut out square access hole to size
(fig.

4

). Make sure there is at least 2 inches

(51 mm) of clearance behind wall surface.

3. Route flush switch cable from wall access hole to

floor access hole at toilet base, leaving about
12 inches (305 mm) of extra cable at toilet.

4. Attach cable to back of flush switch circuit board

(fig.

4

), then fasten flush switch bracket

to wall with supplied screws (fig.

5

).

5. Snap Dometic, Vimar or Gewiss cover plate onto

bracket (fig.

5

) at proper connection points (see

Section 6, back page).

6. WITH ELECTRICAL POWER OFF, connect wiring

cable from the flush switch to the RJ45 connector
on the circuit board of the toilet base (fig.

6

).

6

4

Caution!
If replacing a previous electronic flush
switch, WITH ELECTRICAL POWER OFF,
be sure to disconnect wiring from old
switch before installing new flush switch.

5

VFS, VFP models for VacuFlush toilets

DFS, DFP models for other SeaLand toilets

1.2

Flush switch panel

Advertising
This manual is related to the following products: