SeaLand 3400 Series All-Ceramic Toilets User Manual

Page 6

Advertising
background image

6

STEP 19: Set the toilet in place (fig. 19) and secure to

floor with the #14x2-1/2 inch long lag bolts (fig. 20). Install

decorative bolt caps by pushing them onto bolt heads

(fig. 21).

STEP 20: Place the rear access cover on the back of the

toilet. Press down firmly to seat the fastening strips.
STEP 2: Turn on electrical power and water to toilet.

Lift flush handle and fill toilet bowl with water. Wait one

hour, then inspect the floor around and under the rear of

the toilet for leaks or dampness.
If no leaks are present, toilet is ready for operation.

STEP 7: Insert the

positive (+) 2 VDC wire into

position  of the green terminal block and tighten the

screw securely. Insert the

negative (-) 2 VDC wire into

position 2 of the green terminal block and tighten the

screw securely (fig. 18).

Fig. 18

STEP 8:

ReMove Red cAP fRoM MIddLe

of fLANGe AdAPTeR befoRe fINAL ToILeT

INSTALLATIoN.

IMPoRTANT – do NoT ATTeMPT To SLIde The

ToILeT oveR The fLANGe AdAPTeR. The

ToILeT MuST be SeT doWN oveR The AdAPT-

eR To PReveNT PoSSIbLe dAMAGe.

Fig. 21

fig. 20

Fig. 19

STEP 16: With toilet close to floor flange, connect flex-

ible water supply hose to the water line fitting (fig. 17).

Fig. 17

Advertising
This manual is related to the following products: