Galaxy boiler, Before starting, Installation – Slant/Fin Gas Conversion Field User Manual
Page 7
7
GALAXY BOILER
Remove front panel (Figure 1) by pressing hand
against panel and pushing up. Remove burner access
door (Figure 2) by removing 2 wing nuts, slide panel
forward and out.
BEFORE STARTING
Check contents for kit:
All components are either marked with a red stripe, a
label with a model number or a stamped number on
them.
1.
Honeywell Conversion Kit:
a) Spring: propane = red; natural = stainless steel
b) Regulator adjusting screw
c) Cap screw: propane = black; natural = silver
d) Instructions
e) Label
2.
Main Burner Orifices:
See Table 1 for the correct size orifice as it applies to
this conversion.
3.
Pilot Burner Assembly:
a) Pilot burner:
Standing pilot—Honeywell Q314A
Intermittent ignition—Honeywell Q345A
b) Pilot orifice:
Propane—Honeywell BBR-10
Natural—Honeywell BCR-18
4.
Ignition Control (for IID only):
Honeywell S8600M (for Sentry, Sentinel or Victory V
series boilers) or S8670E (for Galaxy boilers).
Required for conversion to propane only.
5.
Three Labels: Boiler Conversion Label, Affidavit Label
and Gas Valve Label.
6.
Registration Card
Caution: The gas supply shall be shut off prior to discon-
necting the electrical power, before proceeding with the
conversion.
INSTALLATION
1.
Turn Off Gas to Appliance
a) Set thermostat to lowest level.
b) Turn off all electric power to the appliance.
c) Turn the gas control knob clockwise to the off
position.
d) Close all gas cocks.
e) CAUTION: LET BOILER COOL.
f) Remove front jacket panel.
g) Remove burner access door.
2.
Gas Valve Conversion
a) Remove pressure regulator cap screw.
b) Remove pressure regulator adjusting screw.
c) Remove regulator spring.
d) Insert appropriate replacement spring (tapered
end down).
Figure 1. Front Panel
Gas Manifold
Name and
Rating Plate
Lighting
Instructions
(inside front
panel)
Gas Valve
Burner
Access Door
Burners
Jacket Top
Relief Valve
Temperature
and Pressure
Gauge
Pop Safety Valve
Jacket Top
Pressure Gauge
Figure 4. Conversion Kit Installation in Regulator
Figure 2.
Figure 3.