Step 6 – Winco EC22000/A User Manual

Page 18

Advertising
background image

224-00

6

60706-23

STEP 6

Locate the small plastic bag that came with the Briggs & Stratton engine operators

manual. You will use the plastic connector (ref. B) in step 6. You can discard the

other part as it is not needed in this application.

7

8

B

10

8

14

10

2

15

STEP 7

Slide black hose clamps (ref. 8) onto 5/16” fuel hose (ref. 15) by compressing

them with a pliers. Push hose (ref. 8) onto carbon canister nipple marked PURGE

and move the clamp into position at the end of the hose.

Twist and push hose reducer (ref. 14) onto hose (ref. 15) and move clamp into

position at the end of the hose.

NOTE: You can use a small amount of vegetable

oil on the hoses to ease in their connection.

Repeat process for 3/16” hose (ref. 7). This will connect to the engine hose in step

8.

B

Advertising
This manual is related to the following products: