Carrier 38HQ User Manual
Page 4
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
does not obstruct drainage holes (holes drain water
during heating and defrost cycles). Attach unit to
pad with 1/4-in. mounting bolts. Position tiedown
bolts in pad. Any 2 holes in unit basepan may be
used to fasten unit to pad.
Construct round, 23-in. diameter pad a mihimum
of 6 in. above grade to provide clearance under holes
for drainage and ice build-up. In areas where pro
longed subfreezing temperatures or heavy snows
occur: increase clearance from 12 to 18 in. by con
structing an angle-iron frame to support unit 12 to
18 in. off concrete base. Cross angle of frame must
not obstruct coil drainage holes. See Fig. 5 for
recommended frame construction. Extend a 12-in.
gravel apron around pad for condensate and defrost
water drainage field.
Fig. 5 — Mounting the Outdoor Coil
4