Generac Power Systems MC User Manual

Page 24

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

TEST3-ST0P/START SWITCH

Left Hand

10 (Ground)

Remove 15 Amp Fuse to disconnect

starting circuit. Remove panel
top cover. Disconnect wires from
switch terminals to prevent int­
eraction. Set VOM to "+DC” and to

"Rxl” scale, then zero the meter.

Connect meter test probes to the

switch center and right hand ter­

minals (as viewed from switch

rear). Meter needle should not

TT,^-<rQ H QT.ri rph at START - meter

Connect VOM test probes to Switch

center and left terminals (as vi­
ewed from switch rear). Hold the

Switch at START - meter needle
should not move. Release the Switch
to NEUTRAL - meter needle should

not move. Hold the Switch at STOP -
needle should swing upscale to ”0",

.Install new Stop/Start Switch
.Connect Switch wires, install

top panel and 15 Amp Fuse,

Continue tests.

A.)- Set Stop/Start Switch to START

and back to NEUTRAL several times.

An audible ’’click" should be heard

as the solenoid actuates.

2.2-2

Advertising