2 installation, 1 power budget consideration, 2 steps for installation – ADLINK PXIS-2670 User Manual

Page 15: 3 system monitoring, Power budget consideration, Steps for installation, System monitoring, 2installation

Advertising
background image

Installation

7

2

Installation

The chapter depicts the procedure of installation PXIS-2670 chas-
sis.

2.1 Power Budget Consideration

Prior to installing any modules into the PXIS-2670 chassis, please
calculate the system power requirement. The power budget for
every DC outputs shall also be checked, including +5V, +3.3V,
+12V, -12V supply rail.

2.2 Steps for Installation

Follow the step to power on the chassis.

1. Make sure the power switch is in the OFF position.

2. Plug in the AC power cord.

3. Install your controller. Please check the ejector/injector

handle is pushed down. Align the controller edge to the
“RED” card guide, sliding in to the rear of the chassis.
Push up on the ejector/injector handle to fully inject the
card into the chassis. Secure the screws on the mod-
ule’s front panel.

4. Install peripheral modules if any.

5. Press the power switch on the front panel to power on

the chassis.

6. Check the LED to make sure the power input is ready.

There are four Green LED indicators (3.3V, 5V, +12V,
and -12V). The four LEDs will light when power turn on.
The fans should become operational as well.

Note:

If the chassis does not power on, see Chapter 4, Trouble-

shooting and Preventative Maintenance.

2.3 System monitoring

There are LEDs on the front panel for system monitoring, including
powers, temperature, and fans. Please refer to following for the
detail meaning of display status on LEDs.

Advertising