3.1 Mounting of Instrument

Mount the

CP-60

instrument on an appropriate vertical surface using the mounting flanges provided. Avoid areas with

excessive vibration or temperature extremes. The holes in the flanges are 0.31 inch in diameter and form a 6 x 10.75 inch
rectangle. See Figure 3.

It is recommended to use #8 drywall anchors and screws for mounting the

CP-60

to a drywall/sheetrock surface.

Dimensions are in inches.

Figure 3: CP-60

Mounting Dimensions

3.3 Power Supply

The electrical installation should conform to appropriate electrical codes, such as the National Electrical Code in the United
States.

W

ARNING

:

The compliance of the installation to appropriate codes is not

ENMET

’s responsibility.

The

CP-60

should be powered through appropriately sized circuit breakers. See Section 6.0 Technical Data.

Upon supplying power to the

CP-60

:

The green power on LED is lit.

The display backlight is lit, and instrument will step through a start-up sequence: unit serial number, software revision and
gases monitored may be shown on the display.

The instrument may go into alarm briefly, but should stabilize quickly. If the instrument persists in alarm, acknowledge the
alarm by pressing the

A

UDIO

D

EFEAT

/A

LARM

A

CKNOWLEDGE

switch. If alarm persists longer than 30 minutes, verify

Sensor/Transmitter installation, call

ENMET

customer service personnel.

Mains power line is fused for power supply protection. Fuse is 5

x

20mm, 0.630Amp is located in

FH2

, see Figure 5

W

ARNING

:

Continuous gas detection and alarm systems become inoperative upon loss of primary power.