Installation – Glow-worm Clearly Solar Cylinders User Manual

Page 17

Advertising
background image

0020115479_03 - 10/12 - Glow-worm

- 15 -

INSTALLATION

9.1.3

safety devices

The cylinder is delivered with all safety and control devices for the

operation of the unvented domestic hot water supply:

- Temperature/pressure relief valve (90 °C, 7 bar)

- Pressure limiting valve (3.5 bar) with line strainer

- Expansion relief valve (one-way valve, 6.0 bar)

- Solar circuit safety thermostat, set to 80 °C, to be connected

with the solar pump in order to isolate this heat source if there

is a malfunction in the solar control.

- Safety thermostat for electric immersion heater (set to 85 °C).

- Reheating circuit safety thermostat, set to 80 °C, to be

connected to the 2-way motorised valve in order to isolate

the primary heat source if a cylinder thermostat malfunction

occurs.

- Do not bypass the thermal cut-outs or other saftey devices in

any circumstances

9.1.4

Pack contents

Check the contents of the enclosed box.

1

5

6

7

2

3

4

8

Item

Quantity

Component

1

1

Flurocyl

2

solar cylinder in separate packaging

2

1

Safety assembly (pressure limiting valve,

expansion relief valve, connections for

pressure-controlled cold water connection

and hot water expansion vessel)

3

1

2-way motorised valve

4

1

15mm compression cap for secondary return

5

1

Tundish

6

1

Assembly set for hot water expansion vessel

7

1

Hot water expansion vessel:

18 l for Flurocyl

2

200

25 l for Flurocyl

2

250, 300

8

1

Instructions for use, Installation and Servicing

manual

Make sure the cylinder is stored in an upright position in a dry

environment prior to its installation.

9.2

Installation site

Place the cylinder in a suitable location in the building, paying

attention to the following:

- The tundish discharge pipe must be installed with a minimum

slope of 1:200 and must end in a safe and visible place.

- The installation surface must be flat and capable of bearing

the weight of the entire cylinder and associated controls when

full of water.

- The installation site must not be at risk of frost. If necessary,

install a frost protection thermostat.

- The control system for the installed cylinder thermostat must

be easily accessible to the operator.

- There must be sufficient space for the assembly, check and

pressure build-up of the expansion vessel.

- There must be sufficient space for the assembly, check and

maintenance of the immersion heater.

- The floor must be even.

a

Where cylinders are fitted high up in the building

there are some situations where a vacuum could be

created in the cylinder. The installer must consider

in these circumstances the necessity of fitting an

anti vacuum valve to prevent cylinder damage.

This valve allows air to enter the cylinder if the

pressure becomes too low due to draining or thermal

contraction.

9.3

Installation of discharge pipe

9.3.1

Design of discharge pipe

a

Risk of burns and scalds resulting from escaping hot

water.

If there is a malfunction, hot water will discharge from

the TPRV via the tundish.

- Lay the discharge pipe so that it ends at an easily

visible point inside or outside the building where

escaping hot water does not pose a risk to persons.