Installation – Glow-worm Flexicom hx User Manual

Page 21

Advertising
background image

0020107230_04 - 12/14 - Glow-worm

INSTALLATION

- 21 -

Diagram 8.1

8 Gas/Water and Appliance Connection
8.1 Gas Connection

Before connection check the supply of local gas.
The gas supply connection is below the boiler, see diagram 8.1.
The whole of the gas installation, including the meter, should
be inspected, tested for tghtness and purged in accordance
with the current issue of BS6891 and in IE the current edition of
I.S.813 “Domestic Gas Installations”.

Gas Connection

Water Connections

12799

14507

8.2 Water Connections

Provision is made for the water connections to be made from
above the boiler, see diagram 8.1. The position is shown on the
wall template.
Flush out the domestic hot water and the heating systems be-
fore connecting to the boiler.

Advertising