Installation – Glow-worm Flue User Manual

Page 19

Advertising
background image

0020095198_02 - 06/11 - Glow-worm

INSTALLATION

- 19 -

6.6

Terminal siting

Refer to the diagram below and the appropriate

clearances for the flue outlet terminal in relation to

openings, air inlet etc., these must be adhered to.

The minimum siting dimensions for the terminal positions,

A, B, C stated in the diagram, can be applied when a plume

management kit is fitted.

MInIMUM sITInG foR HoRIZonTal flUe

aIR InleT

MM

A) DIRECTLY BELOW AN OPENING WINDOW

50

DIRECTLY BELOW AN OPENING, AIR BRICK 25

B) DIRECTLY ABOVE AN OPENING WINDOW

50

DIRECTLY ABOVE AN OPENING, AIR BRICK 25

C) HORIZONTALLY TO AN OPENING WINDOW

50

HORIZONTALLY TO AN OPENING, AIR BRICK 25

MInIMUM sITInG DIMensIons foR fanneD flUe

TeRMInals PosITIon

MInIMUM sITInG foR PlUMe ManaGeMenT KIT

flUe oUTleT

MM

D) DIRECTLY BELOW AN OPENING, AIR BRICK,

OPENING WINDOWS (Horizontal Discharge)

300

E) DIRECTLY ABOVE AN OPENING, AIR BRICK,

OPENING WINDOWS (Horizontal Discharge)

300

F) HORIZONTALLY TO AN OPENING, AIR BRICK,

OPENING WINDOWS

300

G) ABOVE ROOFLINE

300

For further guidance on siting requirements consult

BS 5440-1 : Table C.1

a

a

b

c

G

D,e

f

15572

The minimum length is 500mm, three examples are shown in

the diagrams below.

Additional elbows, bends and 1M extensions can be used as

required.

1M Extension (white)

A2044300

87° bend (white)

A2044700

2x45° elbows (white)

A2044500

1M Extension (black)

A2044200

87° bend (black)

A2044600

2x45° elbows (black)

A2044400

2

1

/

2

°

Horizontal

Left or Right

IMPORTANT:

Flue must always slope at least
(44mm / m)

towards the boiler

500 min. distance

Advertising