Fit plugs into all unused tappings.

Do not route any pipes across the front of the boiler thermostat
pocket, controls or combustion chamber cover.

Pipework must not be routed directly below the draught diverter
across the boiler, but is allowed to be routed under the edges of
the draught diverter.

4.5 Pump in Boiler Casing

If the pump is to be fitted inside the boiler casing, position it as
shown in diagram 4.6 to either of the front connections.

There must be sufficient clearance “X” between the pump body
and the cleaning door to allow for removal of the door for flueway
cleaning.

4.6 Gas Connection

Do not route the gas supply across the combustion chamber or
burner feed pipe. The gas feed must be along the right hand
side of the boiler.

Make the gas connection to the gas service cock.

4.7 Flue Connection

The flue should be 100mm (4in) nominal diameter, refer to
Section 3 and diagram 1.1.

Fix and seal the flue to the hood in accordance with normal
practice.

Diagram 4.6

Diagram 4.5

WATER CONNECTIONS FULLY
PUMPED SYSTEMS

PUMP CLEARANCES

0874

ALTERNATIVE
FLOW
POSITIONS

ALTERNATIVE
RETURN
POSITIONS
With distributor
tube (not shown)

Clearance 'X' must be left to enable cleaning
door removal and boiler servicing

'X'

FLUEWAY
CLEANING
DOOR

ALTERNATIVE
R.H. FLOW
CONNECTION

ISOLATING
VALVES

L.H. FLOW
CONNECTION

175
(7)

35 (1

3

/

8

)

0875

Diagram 4.4

PIPEWORK
CASING CLEARANCES

VIEW ON ARROW 'A'

1524

'A'

57 MAX.

(2

1

/

4

in.)

BOILER

57 MAX.
(2

1

/

4

in.)

4 Installation

Advertising