7 commissioning – Glow-worm Hideaway 40CF User Manual

Page 14

Advertising
background image

14

221807B

7 Commissioning

FLAME DIMENSION

Diagram 7.3

1009

13 (

1

/

2

in.)

APPROX.

FLAME
DIMENSION

VIEWING
WINDOW

PILOT
BURNER
ASSEMBLY

7.3 Completion

Instruct and demonstrate the efficient and safer operation of the
boiler, heating and domestic hot water system.

Hand the Instructions for Use to the user, for them to keep,
making sure that they fully understand them.

Advise the user that to ensure the continued efficient and safe
operation of the boiler is recommended that it is checked and
serviced at regular intervals. The frequency of servicing will
depend upon the particular installation and usage, but in general
once a year should be enough.

Draw attention, if applicable, to the current issue of the Gas
Safety (Installation and Use) Regulations, Section 35, which
imposes a duty of care on all persons who let out any property
containing a gas appliance.

It is the law that servicing is carried out by a competent person.

Advise that the boiler is fitted with a Flue Blockage Safety
Device and refer to the Instructions for Use.

Reminder - Leave these instructions and the “Benchmark”
logbook with the user.

Fit the plinth front, by locating the sides over the boiler plinth
then lowering to engage the upper and lower hooks, see
diagram 7.4.

Fit four plastic pegs into the required holes in the top panel, see
diagram 7.5. The plastic pegs are a tight fit and are best pushed
home with a flat faced tool.

Push the casing top on to all four side panel locations. From
inside the casing check that all the rivets have engaged into the
holes.

Fit the door by locating the hooked runner at the bottom into the
slots in side casings and pushing on to the studs on the side
casings, see diagram 7.4.

PLINTH / DOOR FITTING

Diagram 7.4

TOP CASING FITTING

Diagram 7.5

0887

UPPER
HOOK

VIEW 1

VIEW 2

STUD

PLINTH
FRONT

LOWER
HOOK

VIEW 1

VIEW 2

1180

PEG POSITIONS IN TOP CASING
A = FRONT EDGE FLUSH
B = 10mm (

3

/

8

in) FRONT OVERHANG

TOP CASING

PLASTIC PEG (4)

B

A

SIDE
CASING
(L.H.)

A

B

SIDE
CASING

SIDE
CASING

DOOR

DOOR

AB

AB

AB

AB

DOOR
FASCIA

Advertising