Natural gas (g20) to lpg (g31) conversion, G31 burner % co, 9 lpg conversion - all models – Glow-worm Ultracom cx User Manual

Page 41: Model co/co2, Throttle turns

Advertising
background image

41

MODEL

CO/CO2

G31 BURNER % CO

2

CHECK

(case on)

9.2 to 10.2

10.0 to 11.0

24cx

30cx

0.004

0.004

10.0

10.5

+ 0.0

- 0.9

+ 0.3

- 0.7

Throttle

TURNS

12.9 LPG CONVERSION - all models

As an option, a chargeable boiler only commissioning service

can be provided by Glow-worm Service by calling telephone

No. 01773 828100.

NOTE: Steps 12.1 and 12.3 will need to be completed before

the appliance can be converted.

This conversion should only be carried out by a

competent

person approved at the time by the Health and Safety

Executive.

During the conversion to Propane use of a suitable flue gas

analyser is necessary.

● The person carrying out a combustion measurement should

have been assessed as competent in the use of a flue gas

analyser and the interpretation of the results.

● The flue gas analyser used should be one meeting the re-

quirements of BS7927 or BS-EN50379-3 and be calibrated in

accordance with the analyser manufacturers’ requirements.

● Competence can be demonstrated by satisfactory comple-

tion of the CPA1 ACS assessment, which covers the use of

electronic portable combustion gas analysers in accordance

with BS 7967, parts 1 to 4.

Tools required to make the conversion are a 2mm Allen key

and an electricians screwdriver.

Having checked :

● the appliance and system have been installed in

accordance with the instructions.

● the integrity of the flue system and flue seals....

● the integrity of the appliance combustion circuit and relevant

seals....

● that all internal/external controls are calling for heat.

● the gas service isolation valve ‘F’, diagram 12.2, is open
(1) Access the gas valve.
(2) Refer to diagram 12.5 and turn the gas valve throttle fully

clockwise.

(3) Turn the throttle anti-clockwise by the number of turns

shown in the table.

(4) Ensure that the gas analyser is set to the correct fuel

setting - Propane.

(5) Attach combustion analyser to the combustion test point,

refer diagram 13.1.

IMPORTANT: Remember to replace the cap on

completion of the test.

(6) Turn on the mains electrical supply and turn on the gas

service isolation valve. Switch the boiler on.

(7) Generate a hot water demand by fully opening a hot

water tap. The boiler should fire automatically.

NOTE: If the appliance does not light and goes to lockout

(F1) turn the throttle anti-clockwise a further turn and

press the reset button, see diagram 12.1. The appliance

will (after a short delay) again attempt to fire. Repeat this

procedure (up to a total of 2 extra turns on the throttle

screw) until the appliance lights. PLEASE NOTE several

ignition attempts may be needed, to purge gas through

the appliance, before a successful ignition is achieved.

(8) Check and adjust the burner %CO

2

at maximum rate.

Refer to diagram 12.1. Press the “reset” button on the

controls fascia, release and immediately press and hold

in the “+” button After approximately 5 seconds “Hi” will

be displayed. Pressing the mode button when “Hi” is

selected will force the boiler to maximum rate, the display

will flash between “Hi” and the “default display” this will

indicate the boiler has been forced to maximum.

(9) Adjust, if necessary, the burner % CO

2

to the value

shown in the “SETTING” column of the table, with the

throttle screw, see diagram 12.5 (rotate anti-clockwise to

increase).

Natural Gas (G20) to LPG (G31) Conversion

OFFSET

ADJUSTMENT

THROTTLE

ELECTRICAL

PLUG

GAS PIPE

RETAINING

CLIP

SEALING

GROMMET

13553

Diagram 12.5

13874

(10) To exit the check sequences press the “mode” and “+”

buttons simultaneously, this will reset the boiler to the

default display.

(11) Check the burner % CO

2

, at minimum rate, to the value

shown in the “SETTING” column of the table.

(12) If adjustment is required, press the “reset” button on the

controls fascia, release and immediately press and hold

in the “+” button. After approximately 5 seconds “Hi” will

be displayed. Pressing the “+” or “-” buttons will cycle

between “Hi” and “Lo”. Pressing the mode button when

“Lo” is selected will force the boiler to minimum rate, the

display will flash between “Lo” and the “default display”

this will indicate the boiler has been forced to minimum.

(13) Adjustment of the %CO

2

is very coarse so carefully

adjust the %CO

2

to the value shown in the “SETTING”

column of the table with the offset adjustment, see

diagram 12.5 and %CO

2

Table (Rotate clockwise to

increase).

(14) To exit the function press the “mode” and “+” buttons

simultaneously, this will reset the boiler to the default

display.

(15) Repeat (8) and check CO

2

at maximum rate - adjust if

necessary. Check that the CO/CO2 ratio is less than the

value in the table above.

Please remember after finishing this procedure to turn off

the hot water tap.

(16) Remove analyser probe from the test point and replace

the cap. Refit the control panel.

(17)

IMPORTANT: Fit the LPG conversion label supplied

in the documentation pack to the inner front panel

alongside the data label. Refit the inner door and

outer door.

(18) Continue commissioning from 12.5.

Advertising