ASSEMBLE THE REACTOR
These reactors require at least 10 sq. ft. of
workspace in a well-ventilated area with 
convenient access to an electric outlet, 
running water, air and a drain. This unit needs 
to be placed at least 10 inches away from 
walls or flammable materials. 
 
1. 
Set the stand in the workspace.
 
2A. 
Removable Vessels. 
First pivot the overarm assembly to the 
back of the support stand. 
 
 The pressure vessel has been shipped 
as a complete assembly; it may be 
easiest on the initial setup to place the 
entire pressure vessel assembly into the 
heater. Note: The complete assembly 
does not need to be removed from the 
heater during opening and closing 
operations. It is designed so that the 
cylinder can remain in the heater while 
the head and split rings are attached or 
removed. 
 
 Once the vessel assembly is in place 
rotate the magnetic stirrer by hand to 
make sure that it turns freely. Then 
move the overarm back into position 
above the vessel. The knob on the top 
of the overarm will raise the upper shaft 
with coupling for attachment to the 
adapter on the top of the magnetic 
stirrer. Push down and rotate the upper 
shaft to bring these components into 
alignment. 
 
 Occasionally the motor housing and 
overarm assembly may vibrate out of the 
standard position. If the upper shaft is 
not in alignment with the center of the top 
of the magnetic stirrer it will be necessary 
to loosen the bolt which attaches the 
motor housing to the support stand. 
Remove the motor housing panel; there 
is a single bolt that runs through the 
lower housing support and the top shelf 
of the floor stand. Once the bolt is 
loosened, rotate the housing the required 
amount, connect the upper shaft to the 
magnetic stirrer and then tighten the 
motor housing bolt. 
 
2B. Fixed Head Reactor.
Bolt the stand to the floor 
using the holes in the 
base plate. 
Loosen the panel screw of the vessel
retainer mounted on the midplate of the 
support stand and open the retainer 
bracket. 
 
 The pressure vessel has been shipped 
as a complete assembly. It is necessary 
to loosen the split ring bolts and remove 
the split ring. Lift the head assembly out 
of the cylinder and slide it into the 
midplate of the stand. Close the retainer 
bracket. The cylinder should be placed 
in the cylinder lift bracket. 
 
 Rotate the magnetic stirrer by hand to 
make sure that it turns freely. 
 
 Connect an air line to the 1/4” quick 
disconnect fitting at the base of the 
support stand. This pneumatic lift 
package will raise or lower the cylinder. 
It may also be used for the heater. The 
lever on the side panel of the support 
frame controls the lift motion. 
 
 The pneumatic package includes a 
pressure regulator with gage located 
inside of the support stand housing. It 
can be accessed by removing the back 
panel of the support stand. The 
regulator has been preset to 50 psi. The 
regulator can be adjusted by lifting up on 
the cap. Rotate clockwise to increase 
pressure, counter-clockwise to decrease 
the amount of pressure sent to the 
pneumatic lift cylinder. Press the cap 
back down after setting the pressure.