Woodhaven 789XL: Dado Jig User Manual

Page 4

Advertising
background image

5. ATTACH WORK STOPS

Attach a Work Stop (789E) to the edge of the Adjustable

& Stationary Tracks. Insert a 3/4" bolt (HB020) in the
T-slot on the edge of each Track, sliding the bolt to the
approximate center of the Track. Install a Work Stop on
each bolt and fasten with a knob (5521). See fig. 5.

3

6. ASSEMBLE & INSTALL CLAMP PAD

Insert the 5/8" screws (MF006) through the holes in the

clamp pad (789G) and start a nut (NUT015) on the end of
each screw. Slide the nuts in to the T-slot of the track (789N)
and tighten the screws. This forms the Clamp Pad assembly.

Insert the 2" bolt (HB055) in the outward facing T-slot

of the Stationary Track of the Dado Jig. Position the bolt
so its between the front Edge Fence and the Work Stop.

Install the Clamp Pad assembly on the bolt, install

two washers (WB002) on the bolt, then install the ratchet
handle (5860) on the end of the bolt. See fig. 6A & 6B.

7. ASSEMBLE THE FRONT TRACK
Attach two Edge Fences (789D) to a 24" Ultra Track (4424)
using 3/4" screws (5771B) and oval nuts (5760B). Insert the
screws through the counterbored holes in the Edge Fence
and start the oval nuts on the ends. Slide the Edge Fence
onto the edge of the Track, capturing the oval nuts in the T-
slot. Center them and tighten. This assembly will now be
referred to as the Front Track. See fig. 7. The remaining 12"
Ultra Track (4412) will be referred to as the Back Track.

5

7

4424 - 24” Ultra Track

with two 789D Edge

Fences attached

Clamp Pad Assembly

789E Work Stop

6A

6B

Advertising