Nexen BD 933507 User Manual

Page 19

Advertising
background image

19

FORM NO. L-20063-AD-0314

11. Press the damaged Bearings (Item 14) out of the Main

Frame (Item 1) (See Figure 17).

12. Press new Bearings (Item 14) into the Main Frame

(Item 1) (See Figure 17).

Note

The tops of the Bearings must be flush with the top of the

Main Frame (Item 1).

13. Press the damaged Bearings (Item 15) out of the Shoes

(Item 3) (See Figure 17).

14. Press new Bearings (Item 15) into Shoes (Item 3)

(Figure 17).

15. Slide the Arms (Item 2) back into the Main Frame

(Item 1) (See Figure 17).

16. Ream the new Bearings (Items 14 and 15) to fit the

Pivot Pins (Item 7) (See Figure 17).

17. Reinstall the Pivot Pins (Item 7) (See Figure 17).
18. Reinstall the Pivot Pin Retainer Plate (Item 6) (See

Figure 17).

19. Reinstall the four Cap Screws (Item 24) to secure Pivot

Pin Retainer Plate (Item 6) (See Figure 17).

20. Tighten the four Cap Screws (Item 24) to 0.762 mm

[5-7 ft-lb] torque.

21. Slide the Friction Facings (Item 4) and Shoes (Item 3)

onto the Arms (Item 2) (See Figure 17).

22. Reinstall the Shoe Pins (Item 16) (See Figure 17).

23. Reinstall the Spring Retainers (Item 5) and Return

Springs (Item 17) onto the Arms (Item 2) (See Figure

17).

24. Screw the Actuator (Item 11) back onto the Arm (Item

2) (See Figure 17).

25. Screw the Adjustment Screw (Item 8) and the Spanner

Nut (Item 12) onto the other Arm (Item 2) (See Figure

17).

Note

On spring engaged BD Caliper Brakes, apply hold-off air

pressure and:

o

BSolete

t

hree

-P

ort

a

ctuator

o

nly

Using a 9/16 inch socket, turn the top bolt clockwise until it
bottoms out (approximately 40 turns), then torque the Tap Bolt
to 13.5-20.2 Nm [10-15 ft-lb].

t

wo

-P

ort

a

ctuator

o

nly

Using a 3/4 inch socket, turn the tap bolt clockwise to fully uncage
(decompress the spring. The spring is fully decompressed when
the hex bolt head is flush against the actuator.

60 PSI Actuator Only

Using a 15/16 inch socket, turn the manual release bolt 12 turns

counterclockwise to fully uncage (decompress) the spring.
Remove hold-off air pressure.

26. Perform Friction Facing adjustment (See FRICTION

FACING CLEARANCE ADJUSTMENT).

DIAPHRAM REPLACEMENT

The diaphragm, part #1555, is the air seal in the service

chamber of the Spring/Air actuator and the Air Actuator.

(See Figure 18).
Air/Spring Actuator:
1. Make sure the Air/Spring Actuator is manually

released as outlined on page 16, MANUAL RELEASE,

Disengagement. Note: Three-port or two-port

instructions.

2. Use a spanner wrench to loosen the spanner nut and

unscrew the Spring/Air Actuator from the brake arm.

3. Using a 9/16” wrench to remove the nut on the clamp

ring. Hold the spring actuator securely in place, remove

the clamp ring and remove the spring actuator from the

service chamber.

4. Discard the old diaphragm and install a new diaphragm

in the bottom recess of the Air/Spring Actuator.

5. Position the Air/Spring Actuator onto the housing/tube

assembly and re-install clamp band.

6. Firmly tap the clamp band around its circumference

while tightening the clamp band nut to ensure proper

seating. Tighten nut to 20-25 ft.-lbs. torque.

7. Screw the actuator back into the arm and tighten the

spanner nut to 10-14 ft.-lbs.

8. Apply air pressure to the service chamber and check

for air leakage.

Refer to page 16, MANUAL RELEASE, Re-engagement

instructions.
Refer to page 8, “FRICTION FACING CLEARANCE

ADJUSTMENT” for Air/Spring Actuator re-engagement

and facing clearance adjustments.
Air Actuator:
1. Use a spanner wrench to loosen the spanner nut and

unscrew the Air Actuator from the brake arm.

2. Using a 9/16” wrench to remove the nut on the clamp

ring. Remove the clamp ring and remove the Air Actuator

pressure cap.

3. Discard the old diaphragm and install a new diaphragm

in the pressure cap.

4. Position the pressure cap onto the housing/tube

assembly and reinstall the clamp bolt and nut.

5. Firmly tap around the circumference of the clamp ring

with a hammer to assure full seating and tighten the

nut to 25-30 ft.-lbs. torque.

6. Screw the actuator back into the arm and tighten the

spanner nut to 10-14 ft.-lbs.

7. Apply air pressure to the service chamber and check

for air leakage.

Refer to page 8, “FRICTION FACING CLEARANCE

ADJUSTMENT” for Air/Spring Actuator re-engagement

and facing clearance adjustments.

CAUTION

Working with spring loaded or tension

loaded fasteners and devices can cause

injury. Wear safety glasses and take the

appropriate safety precautions.

PARTS REPLACEMENT (continued)

Advertising
This manual is related to the following products: