Mantel Clearances for Built-In
Installation
If placing mantel above built-in fireplace, you must

meet minimum clearance between mantel shelf and

top of fireplace opening.

NOTICE: If your installation does

not meet the minimum clear-

ances shown, you must do one

of the following:

• raise the mantel to an accept-

able height

• remove the mantel

NOTICE: Surface temperatures

of adjacent walls and mantels

become hot during operation.

Walls and mantels above the

firebox may become hot to the

touch. If installed properly,

these temperatures meet the

requirement of the national

product standard. Follow all

minimum clearances shown in

this manual.

8. Install gas piping to fireplace location. This

installation includes an approved flexible gas

line (if allowed by local codes) after the equip-

ment shutoff valve. The flexible gas line must

be the last item installed on the gas piping. See

Installing Gas Piping to Fireplace Location,

page 13.

9. Carefully set fireplace in front of rough opening

with back of fireplace inside wall opening.

10. Attach flexible gas line to gas supply. See Con-

necting Fireplace to Gas Supply, page 15.

11. Plug electrical cord into electrical outlet

installed in step 2 if using blower.

12. Carefully insert fireplace into rough opening.
13. Attach fireplace to wall studs using nails or

wood screws through holes in nailing flange

(see Figure 17).

14. Check all gas connections for leaks. See

Checking Gas Connections, page 16.

15. Install trim after final finishing and/or painting

of wall (see Figure 7, page 9).

Figure 17 - Attaching Fireplace to Wall

Studs

Nailing Flanges

Nails or Wood
Screws

Shield

Screw

Support Bracket

Firebox
Wrapper

Power
Cord

Figure 16 - Installing Shield to Support

Bracket

INSTALLATION

Continued

Advertising