Keep the capacitor terminals and reactors clean.

•

Verify the state of the contactors of operating elements.

•

Check that the capacitor current is not less than 25% or greater than 120% of the nominal
value by phase and that there is no phase unbalance greater than 15%.

Annually

•

Perform dielectric rigidity tests on the different elements of the power circuit, applying 2.5 kV
during 1s between the capacitor and earth terminals.

•

Check the capacity of the different steps. An indirect verification can be performed by checking
that the consumption matches the value stated in Table 7.5, with a maximum deviation of ±
10%.

•

Check the tightness of all terminal connections on the different power elements.

•

Inspection of the fuses.
-

Power circuit: NH fuses. Check continuity and temperature.

-

Control Circuit protection: Neozed fuses or circuit breaker. Check continuity and
temperature.

7.2.2 Tightening the electrical connections.

•

The connections must be tight. The following tightening torques for the fuse bases and
contactors are listed in tables 7-1 and 7-2

Table 7-1.- Tightening torques of the cables to the fuse bases

FUSE BASE

TORQUE (Nm)

NEOZED 63 A

3.6

NH-00

15.2