Setup of the assembly – d&b Z5373 T Cluster bracket User Manual

Page 7

Advertising
background image

Interconnecting the cabinets

The T10 cabinets are interconnected with their Front links on both sides
of the cabinet front and with the Splay links on the center rigging strand
at the cabinet's rear.

Front links
Once the Front links slide into the respective track of the next cabinet,
the cabinets are interconnected by inserting the Locking pins on both
sides of the cabinet.

Splay links

Fold out the Splay links of the T10 cabinets and hook them into the
preset Locking pins on the rear rigging strand of the next cabinet.

Once the Splay link is hooked in, the second Locking pin must be
inserted. The second Locking pin acts as a "safety pin" to secure the
Splay link from possible hooking off and to fix the set splay angle.

6.

Setup of the assembly

Preparations

- Prepare the cables and link cables according to the number of

amplifier channels and cabinets used.

- Ensure the HF sections of the T10 cabinets to be used are set to Line

source.

1. Prepare the first T10 cabinet

- Place the first cabinet on the ground.

- Slide out the Front link

- Fold out the Splay link.

2. Add the next cabinet
- Fold out the Splay link of the next cabinet.

- Release the Locking pins on both sides at the front of the cabinet.

- Attach the cabinet to the first cabinet.

- Insert the Locking pins of the Front links on both sides of the cabinet.

To attach a third cabinet, proceed in the same manner.

Z5373 Mounting instructions

(1.0 EN)

Page 7 of 10