Ml - heavy duty lift mechanism – Future Automation ML User Manual
Page 10
Advertising

In
st
al
la
ti
o
n
:
S
ta
ge
5
Page 9 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
ML - Heavy Duty Lift Mechanism
Positioning the Base Infill Panel
Loosen off the frame and move the
base to the centre of the opening.
There should be a gap of about 3mm
[1/8”] around the edges of the base
panel to the cabinet opening.
You will also have to cut a
hole in the base infill panel to
allow the cables to pass up
through to the plasma screen.
The location of this hole will
depend on the screen type
that is going to be used.
Advertising