Ml - heavy duty lift mechanism – Future Automation ML User Manual

Page 7

Advertising
background image

In

st

all

at

io

n

: S

ta

ge

2

Page 6 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

ML - Heavy Duty Lift Mechanism

Fitting Flap Panel to the Mechanism

The 6mm flap and the base should be made as part of the cabinet.
The surfaces of the flap should ideally be varnished or painted to help prevent it from warping.

Take care when fixing the

surfaces together. Place the

objects on a flat surface to

make sure the edges are

properly aligned when they

come into contact.

Try to use as many self

adhesive pads as possible to

get the most secure fixture.

4 holes to be drilled in base panel.
These holes should be12mm diameter
to allow for adjustment later.
Use frame as a template to mark hole
locations.
Example hole locations shown above
are for the Group A frame.

Bolt through the support frame

then through base panel into the

black plates on the beam using

M8 x 30mm or M8 x 35mm bolts

Make sure the base panel lines

up squarely, directly on top of the

lifting beam.

Consult ML TECHNICAL SHEET

before fabricating any flaps or

base panels.

Base Infill

Aluminium Flap

Adhesive
Pad

Flap

Screw base in place from
underside through the 2
fixing brackets on either side.

Advertising
This manual is related to the following products: