Ml - heavy duty lift mechanism – Future Automation ML User Manual

Page 15

Advertising
background image

The IR sensor can be located anywhere outside of the cabinet.

Fix the IR Sensor and Run the Mechanism

In

st

all

at

io

n

: S

ta

ge

1

0

Page 14 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565

ML - Heavy Duty Lift Mechanism

It is very important that once the mechanism is set up, the lift is run in and
out a number of times to bed in and stabilise.

It may then be necessary to re-adjust the height and / or level of the lifting
beam, as first discussed in Stage 4 of these instructions.

Advertising
This manual is related to the following products:

MLI, PL, PLI, HL